Development path

 
 

    ● On October 18, 2007, Dongfeng Mould Stamping Technology Co., Ltd. was established.


  ● In March 2008, the welding line of the Shenlong cradle assembly that the company undertook was officially put into operation.


  ● On May 13, 2009, the company's new factory in Wuhan was completed and put into operation. The first 1600T equipment of the new plant was put into production, and three sets of drawing die for the X7 project were completed on the same day.


  ● On July 7, 2009, the company's corporate culture core concept manual was released.


  ● On July 9, 2010, the company's “Employee Code of Practice Manual” was released.


  ● On October 21, 2010, the company joined Wuhan University of Technology to build a “Master's Program Base for Engineering”


  ● On January 16, 2011, the company's 2010-2015 “D211” medium and long-term business plan was released.


  ● In July 2011, the company's new factory mold factory was completed.


  ● On September 10, 2011, the first model of Dongfeng Nissan's first self-owned brand, the D423 project, was successfully delivered, marking the company's ability to develop and manufacture the key outer cover parts of the car to a new level.


  ● On September 20, 2011, the 2400T press of the new factory mold position was successfully tested. It marks that the first equipment of the side wall mold debugging line is in place, which will play an active role in the localization of Dongfeng Company.


  ● In May 2012, the company's multi-station workshop was officially put into production. The welding robot production line is installed and put into production.


  ● In June 2012, the company was rated as “Key Key Enterprise of China Automotive Panel Die” by China Mould Industry Association (2012-2016)


  ● In July 2012, the company developed and manufactured the Dongfeng Nissan D423 fender punching and trimming shaping die, and the Dongfeng passenger car S15B-class sedan side-circle-shaping shaping die won the first prize and the third prize respectively.


  ● Mold product structure change: from the single production of skeleton parts to the car outer cover mold manufacturing research and development, the current mold products to develop PV vehicle molds, multi-station progressive die and high-strength tailor-welded steel plate molds, successfully achieved The leaping development from truck moulds to passenger car cover moulds.


  ● Advances in mold product design technology: from the drawing board design stage to CAD three-dimensional design, product synchronous development stage, realize three-dimensional design, processing, testing, high-speed processing, laser quenching, TD quenching and other high-tech; successfully developed stamping high The strength plate and the laser tailor welded plate mold have reached the domestic advanced level.


  ● Structural changes of the welded products: from medium and small stamping and welding parts to side wall assemblies and high-strength steel plate assemblies, such as medium and large-sized products with high complex factors and high added value, the welding products are oriented toward large-scale, integrated, and serialized Growing. With the transfer of the N series cradle line (engine bracket assembly) into our company in 2007, the successful conversion of large-scale welded assembly parts filled the gap in the company's large assembly parts. In 2009, the company's G2 production line was put into use, and the output value of each of the welded products was increasing every year. Through several years of development and adjustment, at present, 11 series of welding products such as body floor stringers, center pillar stiffeners, roof curved stiffeners, sunroof reinforcement rings, and front pillar stiffeners have been formed.


  ● Improvement of welding technology: stamping technology from high-strength plate parts to high-strength plate, unequal thickness steel plate, laser tailor-welded plate parts process CAE analysis and product synchronous design, stamping automation technology application (multi-station); welding Technology ranges from single manual welding to robotic fully automated welding technology.

       ● On August 3, 2020, the opening ceremony of Dongfeng Aiji Automobile Stamping Co., Ltd. ("Dongfeng Aiji") jointly funded by the joint venture company of Dongfeng Die Punching Company and Japanese-funded enterprise Yingzhiyi/Aiji Group was held in Wuhan Held.


主站蜘蛛池模板: 性色av一二三天美传媒| 午夜性无码专区| 国产国产久热这里只有精品| 国产美女视频免费观看的网站| 免费无码高潮流白浆视频| 亚洲国产精品高清久久久| 永久不封国产毛片av网煮站| 天天做天天爱天天综合网2021| 久久久精品妇女99| 中文字幕无码精品亚洲资源网久久 | 九九久re8在线精品视频| 久久精品成人免费观看97| 性生大片免费观看668| 国产亚洲精品a在线无码| 亚洲中文字幕无码mv| 精品免费久久久久久久| 国产精品久久久久久婷婷| 欧美三级在线播放| 视频在线+欧美十亚洲曰本| 久久午夜夜伦鲁鲁片免费无码影视 | 大帝av在线一区二区三区| 日本午夜精品一区二区三区电影| 欧美色就是色| 99爱在线精品视频免费观看| 99久久无色码中文字幕| 亚洲一区二区三区影院 | 99精品国产99久久久久久97| 免费国产精品视频在线| 久久www免费人成_看片老司机| 国产午夜福利在线观看视频| 99这里有精品热视频| 久久99精品国产麻豆| 成人国产精品秘?鲁鲁3D| 中文字幕精品久久久久人妻| 好紧好湿太硬了我太爽了视频| 出租屋勾搭老熟妇啪啪| 2021国产成人精品久久| 鸭子tv国产在线永久播放| 色综合伊人色综合网站| 一本加勒比波多野结衣| 少妇高潮太爽了在线观看|